Clamp Tonnage Formula:
From: | To: |
Clamp tonnage refers to the amount of force required to keep the mold closed during the injection process. It's a critical parameter that prevents mold flashing and ensures proper part formation in injection molding operations.
The calculator uses the clamp tonnage formula:
Where:
Explanation: The formula calculates the clamping force needed to counteract the injection pressure acting on the projected area of the mold cavity.
Details: Proper clamp tonnage calculation is essential for preventing mold damage, reducing part defects, optimizing machine selection, and ensuring production efficiency and safety.
Tips: Enter projected area in square inches, injection pressure in psi, and an appropriate safety factor (typically 1.1-2.0). All values must be positive numbers.
Q1: What is a typical safety factor range?
A: Safety factors typically range from 1.1 to 2.0, with 1.5 being common for most applications. Higher factors are used for complex parts or critical applications.
Q2: How do I determine the projected area?
A: Projected area is calculated by measuring the maximum length and width of the part (including runners) as it sits in the mold, then multiplying these dimensions.
Q3: What injection pressure should I use?
A: Injection pressure depends on material viscosity and part design. Typical values range from 5,000-20,000 psi. Consult material specifications for recommended pressures.
Q4: What happens if clamp tonnage is too low?
A: Insufficient clamp tonnage can cause mold flashing (material leakage), part defects, mold damage, and inconsistent part quality.
Q5: Can I use this calculator for different materials?
A: Yes, but you must adjust the injection pressure parameter according to the specific material's flow characteristics and viscosity.